Skip to main content

inside of Pittsburgh Airport Construction Project, explaining project

 Item
Inside of Pittsburgh Airport Construction Project, explaining project
Inside of Pittsburgh Airport Construction Project, explaining project

Scope and Contents

From the Series:

Born digital files given at the same time as physical files

Dates

  • Creation: Majority of material found within 2021 - 2024
  • Acquisition: 2024-11-21

Conditions Governing Access

This collection is open for research.

Full Extent

From the Collection: 2.5 Cubic Feet

Full Extent

From the Collection: 1.2 GB (515 Files) Gigabytes

Language of Materials

From the Collection: English

Repository Details

Part of the Pennsylvania House of Representatives Archives Repository

Contact: